Skip to main content

Folder Town Planning

Categories

Documents

pdf Notice of Environmental Authorisation Proposed New Dam Expanded Cultivation Area & Connecting Pipeline Infrastructure Farm Vergelegen Eilandia, Robertson

531 downloads

With reference to the above application, the Department hereby notifies you of its decision to grant Environmental Authorisation and to adopt the MMP, attached herewith, together with the reasons for the decision.

In terms of Regulation 4 of the Environmental Impact Assessment Regulations, 2014, (as amended), you are instructed to ensure, within 14 days of the date of the Environmental Authorisation, that all registered Interested and Affected Parties (“I&APs”) are provided with access to and reasons for the decision, and that all registered I&APs are notified of their right to appeal.


pdf Executive Summary Proposed Effluent Treatment Plant Lactalis Bonnievale August 2022

818 downloads

NOTIFICATION OF AN APPLICATION FOR ENVIRONMENTAL AUTHORISATION AND THE AVAILABILITY OF THE DRAFT BASIC ASSESSMENT REPORT FOR COMMENT: THE PROPOSED WASTEWATER TREATMENT WORKS (WWTW) AND ASSOCIATED INFRASTRUCTURE FOR LACTALIS FACTORY IN BONNIEVALE, WESTERN CAPE

DEA&DP Pre-application Ref nr:   16/3/3/6/B1/4/1145/22

Notice is hereby given of a public participation process in terms of the National Environmental Management Act (No. 107 of 1998) (NEMA) and the 2014 Environmental Impact Assessment Regulations, as amended.

Lactalis SA (Pty) Ltd is proposing a Wastewater Treatment Works and associated infrastructure on Remainder Farm 695, Bonnievale, Western Cape. Please refer to the attached notification in this regard.

A Draft Basic Assessment Report (DBAR) and Environmental Management Programme (EMPr) will be available for a 30-day public review and comment period from 31 August 2022 – 3 October 2022.  The documentation can be reviewed at the Bonnievale Public Library (16 van Zyl Street, Bonnievale, Tel.: 023 616 8016). The DBAR is available for download in an electronic format on Amathemba Environmental Management Consulting’s website by accessing the following link http://amathemba.com/public-documents/ or can be requested in an electronic format (CD) from the contact details provided. 

A comprehensive Executive Summary is also available as a stand-alone download for those I&APs with limited data. 


pdf UKULUNGISELELA KUNYE NOKUNGENISA IPLANI YOKWAKHA

451 downloads


pdf BUILDING PLAN PREPARATION AND SUBMISSION

2283 downloads