This letter serves as notice of the Public Participation Process for the proposed development. The commenting period will be from 13 June 2023 until 14 July 2023.
A digital version of the Draft Amendment Report is available for download from the following link: https://www.groenbergenviro.co.za/projects/?dir=1888.
As contemplated in the Protection of Personal Information Act, 2013 (Act no. 4 of 2013), for the purposes of this particular project, private information will only be made available to the public as and when required on receipt of written consent specified by the I&AP. Should the I&AP wish to provide consent, a form is included in Appendix A below, which can be returned to the EAP, at details indicated below.
If there are any problems downloading the reports, or should there be any queries, please do not hesitate to contact Mische Molife at This email address is being protected from spambots. You need JavaScript enabled to view it.
DEA&DP EA reference: 16/3/3/2/B1/4/1006/22