The Final Scoping Report was approved by the Department of Environmental Affairs and Development Planning on 24 February 2022, and as such, the EIA phase has commenced.
The Draft Environmental Impact Report (EIR) and supporting documentation is available for a 30-day public review and comment period from 16 April 2021 to 20 May 2022 at the Robertson Public Library (30 Van Reenen Street, Robertson, 6705, Tel.: 023 626 8205), in an electronic format or by accessing the following Google Drive link https://drive.google.com/drive/folders/1e3Z3oOHJ6qyXpvc2YX5_BjOmpIxUMbXJ?usp=sharing or can be requested in an electronic format (CD) from the contact details provided.
View the notification and a comprehensive Executive Summary here:
Comments must reach the environmental consultant by no later than the 20 May 2022, by one of the following means:
Post: PO Box 3420, Tygervalley, 7536
Fax: 0865526764
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
DEA&DP Reference Number: 16/3/3/2/B1/14/1067/21